Search

RU

Business-ready Infrastructure

Moglino SEZ is completely ready for tenants and their manufacturing facilities. Some of the factories have already started manufacturing products. The availability of substantial generation capacities means that any manufacturing company can be provided with the required and cost-efficient energy resources:

The utilities are set up and ready to go. The tenant has to extend the lines to his plant from the existing hookup points. The investor does not waste time on building roads, laying gas, water and electricity lines, permits and approvals. Moreover, connection to the existing utility systems is absolutely free.

The quality of the utility infrastructure: all infrastructure facilities of Moglino SEZ were put into operation in 2016-2017, thus being in the prime of their service life.

Next
ru
Information disclosure +7 8112 29-33-33